SOW Report
Contract 84068 REL 22: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
84068 REL 22
Contract Title:
2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Continuation:
Previous: Next:
84068 REL 12: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Status:
Issued
Contract Description:
The Yankee Fork River, historically a major Chinook salmon producer, has been severely altered by dredge-mining that occurred between 1938 and 1952, eliminating much of the natural meander pattern of the stream and associated in-stream habitat, riparian vegetation, and function. The restoration and monitoring work contracted under project 2002-059-00 is implemented with the goal of restoring natural river channel characteristics, floodplain function, hydraulic and sediment regimes, and aquatic habitat within the dredged reach of the Yankee Fork Salmon River (YFSR). The Yankee Fork Restoration Project has focused on restoring an approximately six mile section of stream habitat on private land in the Yankee Fork basin by removing or redistributing dredge tailings piles to restore or improve the connectivity of aquatic and floodplain habitat; by the addition of large woody debris, boulders, substrate, and riparian plantings to improve the complexity of aquatic and riparian habitat; and by creating or rehabilitating existing side channels.  

While the majority of restoration work within the six mile dredged reach has been completed, this project continues to have the goals of increasing the quantity and quality of instream habitat and improving floodplain function for all fish species and life stages (with a focus on anadromous fish).  A large part of the restoration work has been implemented through concurrent contracts under this project with Trout Unlimited (TU) because of TU's relationship with the Simplot Company, the largest private landowner within the Yankee Fork drainage. Beginning in FY25, the focus will be to implement additional restoration projects identified in the DRAFT Yankee Fork Interdisciplinary Team's 5-Year Plan (2024-2028).

The Yankee Fork Restoration Project has been collecting data since 2006, including juvenile abundance and distribution (via snorkel surveys) at restoration sites and unrestored sites in the basin. In 2020 topographic habitat surveys were conducted to monitor changes in habitat at the Bonanza site. These data can be compared to data at a later date to assist in determining any significant changes with large wood mobilization, depth of pools and number of pools, sediment deposition/aggregation, and changes to other habitat features.  Staff will collaborate with other Yankee Fork ID team members (e.g., Trout Unlimited, U.S. Forest Service) to assess fish presence, habitat use, and movement, as well as assessing stream flows and groundwater dynamics through the Bonanza reach.  Data collected for these surveys will include discharge measurements and photo points. The project will also enter data collected from past years into a database and the Yankee Fork ArcGIS platform.

The Bonanza City project is at the upstream end of the dredged area, near Jordan Creek. The final phase of instream habitat construction at this site was completed in 2020. Post-construction monitoring and adaptive management has been necessary each year since completion in order to address low flow conditions and potentially compromised fish passage in the project area. Monitoring and adaptive management has been a coordinated effort between Trout Unlimited and the Bureau of Reclamation. YFSR Restoration staff provide continued oversight, and that the information generated is shared across other projects.

The SBT will continue to work with the Yankee Fork Interdisciplinary (ID) Team in 2025-2026 to refine and update the DRAFT Yankee Fork Interdisciplinary Team 5-Year Plan (2024-2028). This document is posted in Contract 84068 REL 12 and portrays the prioritized list of projects for implementation through at least 2028. Contract staff have been working collaboratively with the Yankee Fork ID team to develop an Atlas planning and prioritization framework that incorporates fish and habitat data in the basin. This effort builds on past geomorphic assessments and basin planning documents (e.g., Yankee Fork Tributary Assessment [2010] and the 5-year strategy plan developed under a previous contract [Yankee Fork Habitat Restoration Plan, Yankee Fork Salmon River, Idaho, December 2019]) to help define the future direction of fish and habitat restoration in the Yankee Fork basin.
Account Type(s):
Expense
Contract Start Date:
03/01/2025
Contract End Date:
02/28/2026
Current Contract Value:
$644,641
Expenditures:

* Expenditures data includes accruals and are based on data through 28-Feb-2025.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes Yes Supervisor chad.colter@sbtribes.com (208) 239-4553
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Kira Finkler Trout Unlimited (TU) No Interested Party kfinkler@tu.org (208) 345-9800
Jim Gregory Trout Unlimited (TU) Yes Interested Party gregory_jim@yahoo.com (208) 390-5306
David Kaplowe Bonneville Power Administration Yes Supervisor djkaplowe@bpa.gov (503) 230-5365
Elsha Leavitt Shoshone-Bannock Tribes No Administrative Contact eleavitt@sbtribes.com (208) 478-3795
Eric Leitzinger Bonneville Power Administration Yes F&W Approver ejleitzinger@bpa.gov (503) 230-3534
Verl Miller Bonneville Power Administration Yes COR VCMiller@bpa.gov (503) 230-3468
Hunter Osborne Shoshone-Bannock Tribes Yes Supervisor Hunter.Osborne@sbtribes.com (208) 239-4564
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Joseph Snapp Shoshone-Bannock Tribes Yes Contract Manager joe.snapp@sbtribes.com (208) 241-3715
Jacee Weed Shoshone-Bannock Tribes Yes Administrative Contact jacee.weed@sbtribes.com (208) 239-4551
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Caselle Wood Trout Unlimited (TU) Yes Interested Party caselle.wood@tu.org (208) 390-2028


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Routine Administration of Contract 02/28/2026
Environmental Compliance Complete C: 165. Participate in the Environmental Compliance process 02/28/2026
Completed Progress (Annual) Report D: 132. Submit Progress Report for the period March 2025 to February 2026 to be completed in 2026 02/28/2026
Watershed Coordination E: 191. Yankee Fork Interdisciplinary Team and Design Meetings, Habitat Implementation Coordination 02/28/2026
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish F: 114. Refine Project Implementation Schedule 02/28/2026
Document Outreach & Education G: 99. Attend or Present at Public Outreach Events 02/28/2026
YF Data Upload & Management H: 159. Consolidate YF Geomorphic and Biological Data and Upload into Centralized Database 02/28/2026
Produce accessible, error-checked datasets I: 157. Juvenile Salmonid Surveys on the YFSR--Electrofishing 02/28/2026
Produce accessible, error-checked datasets J: 157. Juvenile Salmonid Surveys on the YFSR--eDNA 12/31/2025
Produce accessible, error-checked datasets K: 157. Rapid Habitat Assessment 12/31/2025
TAG Fish and Upload to PTAGIS Database L: 158. PIT Tag Fish 02/28/2026
Deliverable: An accessible, error-checked data set with metadata M: 162. Analyze Juvenile and Adult Salmonid Data 02/28/2026
External Data Sharing N: 161. Disseminate Juvenile and Adult Salmonid Survey Data 02/28/2026
Produce accessible, error-checked datasets O: 157. Installation of PIT Arrays in the mainstem Yankee Fork and the West Fork Yankee Foek 02/28/2026
Completed designs of SBT led Projects in Yankee Fork Salmon River Drainage. P: 175. Design Low Tech Process Based Restoration projects to be implemented by SBT staff 02/28/2026
Completed Progress (Annual) Report Q: 132. Submit Progress Report for the period March 2024 - February 2025 03/31/2025

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 114 Identify and Select Projects
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 175 Produce Design
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 114 Identify and Select Projects
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Routine Administration of Contract
C 165 Participate in the Environmental Compliance process
D 132 Submit Progress Report for the period March 2025 to February 2026 to be completed in 2026
E 191 Yankee Fork Interdisciplinary Team and Design Meetings, Habitat Implementation Coordination
F 114 Refine Project Implementation Schedule
G 99 Attend or Present at Public Outreach Events
H 159 Consolidate YF Geomorphic and Biological Data and Upload into Centralized Database
I 157 Juvenile Salmonid Surveys on the YFSR--Electrofishing
J 157 Juvenile Salmonid Surveys on the YFSR--eDNA
K 157 Rapid Habitat Assessment
L 158 PIT Tag Fish
M 162 Analyze Juvenile and Adult Salmonid Data
N 161 Disseminate Juvenile and Adult Salmonid Survey Data
O 157 Installation of PIT Arrays in the mainstem Yankee Fork and the West Fork Yankee Foek
P 175 Design Low Tech Process Based Restoration projects to be implemented by SBT staff
Q 132 Submit Progress Report for the period March 2024 - February 2025